Monday, July 9, 2018

Master Bath Remodel

 We had already emptied our closets and taken the closet doors down before Jeff and Lesa arrived on June 18.  Notice the gold on the wall that was the previous theme in this bathroom from 1991.  The first order of business was to remove the old lavatory and cabinet. There was a stub wall beside the sinks/cabinet that had to go because of the new lavatory top being an inch bigger.  The wiring for the lights and fan and switches was in that stub wall. 
 The previous floor coverings were carpet in the sink and closet areas and linoleum in the toilet/shower area.  The tile part you see in this photo was from the remodel work we did in December 2017 to take out the bathtub and put in a walk in shower.  Here is the link for the story of the remodel start at Christmas 2017. 
 The old is out.  Our Trash Service, Rumpke's was so kind to take away all the debris and trash we produced during this project! 
 Lesa is such a cheerful helper to Jeffrey in all of the hard work.  This was when she wasn't working, just brightening up the room with her smile.  Jeff and Lesa left Iowa to come here in such a rush, they missed putting in the suitcase with their work clothes.  So when she was in the thick of the work, she wore Emily and Elizabeth's painting work clothes.
 After the carpet was removed, there was cleaning to do.  We discovered old pet stains on the chipboard, which we treated before putting anything on top of it.
 Bringing in the new cabinet.  It is several inches taller than the old.  The mirror on the wall above the sink area had to be moved up.  Of course, it was removed during this time... One thing about this cabinet is that it has 6 drawers!! Such a blessing, as we have had no drawers in the old cabinet.
 The stub wall was removed, and in this picture Jeffrey is doing some plumbing work to make the pipes fit around the drawers in the cabinet.  He had to rewire the lights and move the switch to the wall.  I so much appreciate that he was able to run new wire to separate the lights above the sinks from the lights above the shower area!  This makes it possible for me to sleep after Rowen gets up early for a shower.  Our bedroom is a vaulted ceiling and the wall pictured here does not go to the ceiling, so it has always been VERY BRIGHT in our bedroom anytime the bathroom lights were on.
 The new cabinet, backsplash, and sinks installed!  We feel like there is more counter top space with the rectangular sinks.  The new 3 rocker-switch is right inside the door.
 We have new light fixture above the sinks.
 They are more directional, sending light down, rather than up and over that wall!  Jeffrey had a plan to fix the hole the stub wall absence left.   Jeffrey making sure there are no leaks in the plumbing. 
They laid out and cut the cement board to cover the entire floor, then put down the thinset mortar to glue it down.
Then they screwed the cement board down.
 Lesa had drawn a grid pattern all over the cement board when it was laid in there dry, so she had a plan for screws at regular intervals.
 Rowen got a new wet tile saw for this project (think Father's Day sale) and he and Jeffrey practiced learning to use it before starting the tile work.
 The Saturday of cutting tile was quite a day.  Jeffrey was the cutter; Lesa was the runner, and Rowen the measurer.  Lesa would take a tile with measurements from Rowen, run down the stairs to the garage, give it to Jeffrey.  Then she ran into the house to protect her ears from the noise, while Jeffrey cut the tiles.  As soon as the noise stopped, she went to the garage, wiped the tiles and carried them to Rowen in an old towel, and Rowen had a new one measured for her to take to Jeffrey...She got her exercise!!!
 After this picture, we did find better ear plugs for Jeffrey to wear.  Hopefully his ears did not suffer harm from the noisy tile saw.  In this picture, he was practicing for cutting a circle for the toilet piece, a technique that was not successful (see final method below).  We had scraps he could practice on, leftovers from doing the Christmas project.
 Rowen measured and marked every cut, and nothing was glued down until everything was laid out dry.  This part took over half the day and gluing them down took the other half of Saturday.  We had planned to go to a Southern Gospel Concert Saturday evening, but it ended up only Janet, Elizabeth, and Emily were free to go. 
 We liked these spacers better than just the little cross spacers we had used before.
 Ready to take them up and organize them for laying.  All the cut pieces were marked with letters and numbers, and the wall just above the floor marked with corresponding letters and numbers.  All the pieces were laid out on our bed on a sheet so that each piece would end up back in the spot for which it was created!
 Jeffrey did an amazing job cutting out the circle for the toilet, and the rectangle for the register.
 Lesa was ready to receive the tiles to place on the bed.
 She was very systematic about it, and her system worked well!
 Since the tiles were 16x16, we had  to use a 1/2" sq trowel to make parallel lines, not swirls, and also treat each tile back.  That way there would not be air pockets underneath that could cause cracking.
 Rowen and Jeffrey worked as a wonderful team.
 
The (Colorado!) license plates were used to hold the space between the vertical tile baseboards of the "sticking out wall" and the floor tiles.
 
 Lesa was ready with all the cut pieces as soon as they were needed.  Along the wall, the boxes were full of things that belong in the closets we emptied.  
 Finishing up in the doorway
 Tiling done at the end of the day
 There was a sticky note on the cabinet to match the letters and numbers of the tile that went there.
 Pretty tricky around the closet post.
 
 The way Jeffrey ended up doing the toilet cutout.
 Success!
 The seam sealing artwork before the tile went down, forever hiding it from view!
 The grouting team on Monday, June 25
 The grouting mess! 
New lighting above the shower area.  This light bar was installed in the basement when we moved here.  We saved it when we replaced the lighting down there and it was perfect to use for the shower area and didn't cost anything, except for the light bulbs!
 After the trim board was added and painted to close the stub wall hole.
 Baseboards reinstalled. New register installed (the other one had been so rusty and ugly looking!) and toilet back in place and functional again (Yea!!)
 Able to use the shower again!!
 Before the trim oak quarter round was put around the cabinet, and before the closet doors were put back on...Jeff and Lesa worked hard to spray paint the gold metal parts of the closet doors and medicine cabinet.  We love having new faucets and everything is so wonderful now!
 
 The room looks so big without anything in the closets and the doors not on yet.
At this point, Jeffrey and Lesa went back to Iowa, having done such a wonderful two-week remodel job for us.  We loved having them here.  Thankfully, not every minute was spent working.  We had lots of good conversation, prayer times, and even a few games.
Rowen worked on all the finishing touches.  We were happy to move back into our closets and get all the totes and boxes out of our bedroom!
 After the oak quarter round and baseboard piece was on, and new towel ring installed.
 We have a new strip rug for in front of the cabinet and the quarter round is such a nice finishing touch.
On July 3, we installed the closet doors!
We also have a towel bar under the clock and calendar (seen in the mirror reflection).  The folding chair lives in the other side, for sitting down to get dressed.  We'd like to get some other kind of chair to have in there instead of the folding chair, but we haven't shopped for one yet.
We are so thankful to have this job done!  It had been looming over our heads ever since Christmas!  So thankful Jeffrey and Lesa worked their schedule to allow time here to work for us and for all the safety, help, and wisdom the Lord gave them throughout the project!

Saturday, July 7, 2018

June in Kentucky

Janet's sister, Brenda and her husband, Charlie Owens were in the Cincy area for his nephew's wedding the first weekend in June.  On June 1, they surprised the girls at Chick-fil-A by stopping by for a few minutes and hugs.
 Later that evening, they came by our house to visit.  It was good to see them, but next time, they are staying with us!
On June 2, Janet was at a funeral at our church and got the picture below from Rowen.  He was getting ready to replace the deck door screening, when he came across this snake on our deck.  He had a screw driver in his hip pocket, and impaled the snake to our deck!  We didn't know what kind it was, but our general idea is to kill it and find out later.
 After it was impaled, it tried to get away.  The effort was fruitless.
Since then, we think maybe it was a ratsnake, which is not harmful to humans, but good for killing rodents.  But to prevent heart attacks to the humans that live here, it's better to get rid of all snakes.  We were advised to put out mothballs, and haven't seen any snakes since.  Janet went to a neighbor gathering next door that afternoon and several of the neighbors whipped out their phones and shared their snake pictures.  Apparently, they are common in the area, but we hope they won't visit us again!
 The same day, Rowen spotted this large turtle below our deck.  It was the day for startling encounters with critters... 
 On June 3, we had Anthony and Adrian Arender and their children and two nieces over for Sunday dinner.  They recently moved to God's Bible School and attend our church.  We loved the opportunity to get acquainted with them.
 We've been enjoying eating breakfast on the deck lots of mornings this summer.  Early morning is the best temperature time of the day to be outside.
Emily decided to trade off her Red Chariot.  She had put so much money into it, and wanted something more reliable.
 So she bought this 2005 Toyota Camry.  It is very similar to Elizabeth's, except that it is light brown instead of silver, and a fancier package, including leather seats and a sunroof.
 Joyce Cooper is one of the adult Sunday School teachers who we really enjoy.  She is a lifelong teacher and brings so many interesting tidbits to the lesson. 
 Our church had VBS in June.  There were up to 75 children who came.  Frances Stetler did a fantastic job of keeping the kids' attention and getting across her theme of Treasures Money Can't Buy.
 The program on Sunday morning
 The children who could come for the Sunday morning program enjoyed playing How Great Thou Art with handbells.
 Our pastor and pastress, Darrell and Regina Stetler.  We love them so much!
 We girls were coordinating that Sunday.
An update on the growth of our Earthbox garden.  We are having to cut the tops off of the tomato plants about every week to keep them about Janet's height.
 The zucchini have been disappointing.  There are too few female blossoms so we have few zucchini fruit on the vines.  We don't know what to do about that...
 Father's Day Rowen and his girls
Emily played a beautiful offertory that morning on her violin. The medley included: "Tis So Sweet to Trust in Jesus," and "I Choose to Trust."
 Steve and Korin Harms came over for dinner on Father's Day.  Their kids were with grandparents and they looked so lonely that we had them over and taught them Qwerkle and Things games.
 Jeffrey and Lesa showed up early Monday morning and stayed until the end of the month with us.  They helped us by finishing the master bath remodel that we started at Christmas time.  That's another post for next time.  This picture was taken the following Sunday when Jason and Karen also were here with us for dinner.
 That afternoon, Emily did a sweet photoshoot with Jeffrey and Lesa.  Out of a hundred wonderful pictures (they are so photogenic) I'll share the following:
 Monday evening, June 25, we went out to eat at Dewey's Pizza in Newport, KY.
 Then we walked on the Purple People Bridge across the Ohio River.
 These kids are so talented, they can be in different states and still kiss!
 Then we took a very long walk all the way from the Newport on the Levee across the Taylor-Southgate Bridge to the Ohio side and all the way to Smale Park.  Next time, we'll park on the other side closer to the park!!
 We finally arrived at the first huge swings and rested a bit.
The flowers were so gorgeous!
 Our kids in front of the Roebling Bridge

It was so special to spend the evening together.
 Saying our goodbyes to Jason and Karen after we had a circle of prayer time.  This was the evening before Elizabeth left on her summer internship--a couple weeks in Hobe Sound, Florida at Gospel Publishing Mission, and then a month in Taiwan with missionaries there doing VBS and English camps and adult English classes.
Karen and Emily
On June 28, Jeff and Lesa made us an Israeli supper.  They made falafels, which look like meatballs, but have garbanzo beans as the protein in them.  They were yummy!
 
Emily and Lesa played MasterMind repeatedly, plus a word game, Jotto, quite a bit.
 After Jeffrey and Lesa left on June 30, Emily and Janet went to the bridal shower for a girl in our church who is getting married in August.
Charlie Stamper 
 Her sister, Brittany, took notes as she unwrapped many beautiful and useful gifts.